+86-24-31515116
info@sycomptech.com
Fejsbuko
Twitter
Google+
LinkedIn
Jutubo
logo00
  • HEJMO
  • PRI NI
  • PRODUTOJ
    • Cementa Kompresoro
    • Sekigaj Ekipaĵoj
    • Log Skidder
    • Pogranda Pulvora Pneŭmatika Transportilo
    • Antaŭfilmaj Partoj
    • Heavy Duty Machinery Parts
    • Stampantaj Partoj
    • Casting Parts
  • Ekipaĵoj
  • NOVAĴOJ
  • KONTAKTU NIN
Produkto estis aldonita al via ĉaro

de Transposh - translation plugin for wordpress

Blog

Hejmo NOVAĴOJ Kiel uzi pograndan cementan petrolŝipon, cemento bulker, cementa portanto kaj cementa antaŭfilmo

Kiel uzi pograndan cementan petrolŝipon, cemento bulker, cementa portanto kaj cementa antaŭfilmo

2020-04-26NOVAĴOJspdc

1, Loading

1.1, Before open the manhole, firstly must open the relief valve of tanker, and check the inner tanker pressure is equal to atmospheric pressure, i.e. the pressure gauge value is zero.

1.2, After open the manhole, check if there was agglomerate of powder material in the tanker, especially the tanker ever loaded powder material and was off duty for long time. In case there was the agglomerate, must get rid of it.

1.3, After material loaded, check manhole seal ring is with power material or not, if yes, clean it to ensure the sealability.

2, Unloading

2.1, Connect the discharge hose of tanker to the needed place, ensure the sealability.

2.2, Close the discharge butterfly valve, outside air supply valve and the assistance air valve.

2.3, Start the engine of truck, when the brake pressure reached at 392KPa, depress the clutch pedal, engage PTO, then release pedal slowly. After the compressor run smoothly, then accelerate to the rated speed and supply the pressed air to tanker.

2.4, When the pressure gauge value reaches to 196KPa, open the discharge valve. During the unloading period, if the pressure raised and tend to exceed 196KPa, that means the discharge pipe was blocked.

2.5, Control the gas pedal, keep the discharge pressure between 185 and 196KPa. The normal bulk cement discharge speed is 1.1mt/min. When the tanker is empty, the tanker’s pressure would be 9.8-19.6KPa, at this moment open the air assistance valve, make sure all the powder material in discharge pipe blew out.

2.6, Release gas pedal, depress the clutch pedal and disengage PTO, stop the compressor.

2.7, Open the relief valve of tanker, exhaust the remaining pressed air in tanker, make the inner pressure equal to atmospheric pressure.

2.8, When the unloading horizontal distance is over 5 meters or vertical height is over 15 meters, after open the discharge butterfly valve, the assistance air valve would be open, so that dilute the density of powder material and raise the pumping height.

3, Daily maintenance

3.1, Often check the pressure gauge, if fail show the normal pressure, must be replaced at once.

3.2, Frequently inspect and adjust safety valve, make the safety valve work at the pressure of 180-200KPa.

3.3, Often check the air filter of compressor. The paper air filter need to be cleaned every month. The cleaning method is using pressured air (pressure less than 0.6MPa) to blow the air filter from inside to outside. If the compressor was used in the very dusty environment, the cleaning period need to be shortened. After the filter was cleaned 5 times or very dirty, then it need to be replaced a new one.

3.4, The engine oil of compressor need to be changed regularly, normally every six months

Previous post Kion rimarki por uzado de bulkerkompresoro

6 comments. Leave new

Royal CBD
2020-05-08 pm8:01

What a information of un-ambiguity and preserveness of precious familiarity concerning unexpected emotions.

spdc
2020-08-03 pm4:13

Thanks for your interests.

ปั้มไลค์
2020-07-28 pm11:49

Like!! I blog frequently and I really thank you for your content. The article has truly peaked my interest.

spdc
2020-08-03 pm4:13

Thanks for your interests.

Royal CBD
2020-08-02 am10:31

Thanks for finally talking about > china How to
use a bulk cement tanker, cemento bulker, cement carrier
and cement trailer factory, provizanto, fabrikanto – Shenyang Comptech Maŝinaro Teknologio Co.,Ltd.
< Liked it!

Also visit my web site – Royal CBD

spdc
2020-08-03 pm4:12

Thank you for your interests.

Novaĵoj

  • Kiel uzi pograndan cementan petrolŝipon, cemento bulker, cementa portanto kaj cementa antaŭfilmo 2020-04-26
  • Kion rimarki por uzado de bulkerkompresoro 2020-04-20

Kontaktoj

No.208 Suda Jangzio Strato Huanggu Distrikto Shenyang Ĉinio
+86-24-31515116
+86-24-31515117
info@sycomptech.com

Sekvu Nin

Fejsbuko
Twitter
Google+
LinkedIn
Jutubo
Kopirajto © 2018 Shenyang Comptech Maŝinaro Teknologio Co.,Ltd.